Andrew
Orient, Maine
Mt.Katahdin
This is on the way to camp on Rt. 95
Click on pic below to enlarge them, they are thumbnail size
Below i have edited what i think we should be doing, questions in blue.
Kitchen: New 1/2" osb floor, remove trap door as there is another entryway.
Remove upper cabinets and sheetrock all walls and ceiling, did you want the area were the refrigerator is and put shelf's in there to make pantry?
(we could put louvered doors on it.)
Floor
new 4" T&G pine flooring, 3 coats urethane. (seal) you want it stained?
Bedroom
Remove 2 closets and cover with the panel taken off if possible
Living room
remove ceiling tile and wet and or molded insulation. readjust strapping for sheetrock.
would like to see new trim (smaller) in this room?
readjust
floor support were possible
Bathroom
Move wall out 3 foot. install new Toilet, Pedestal and claw tub, new light
fixture
install 4" T&G floor to mach Kitchen, possible pine walls?
Basement
remove this entryway from kitchen.
everything sitting in water.....maybe install cement blocks under beam suport?,
not that exspence as long as we are readjusting floors by jacking it up anyway
work on furnace (warm air unit), and electrical
I'm looking at minimal 8 days labor for entire project, that's with very little extra leeway.
Thanks
Tom Ammerman
207-827-3212
P.S we to need temporary fix roof and many other little things that will come up
i.e. new basement door, new outlets, light fixtures, broken windows etc.
was unable to see roof because it was full of snow........