Below i have edited what i think we should be doing, questions in blue.

Orient (6).JPG (212656 bytes)  Orient (7).JPG (209211 bytes)    Orient (10).JPG (135706 bytes)  new outer screen door.

 

 

Kitchen:    New 1/2" osb floor, remove trap door as there is another entryway.

Orient (14).JPG (151727 bytes)  Orient (17).JPG (151209 bytes)  Orient (16).JPG (162403 bytes) 

Remove upper cabinets and sheetrock all walls and ceiling, did you want the area were the refrigerator is and put shelf's in  there to make pantry?

(we could put louvered doors on it.)

Floor

new 4" T&G pine flooring, 3 coats urethane. (seal)   you want it stained?

 

Bedroom

Orient (12).JPG (148367 bytes)  Orient (13).JPG (153912 bytes) 

 Remove 2 closets and cover with the panel taken off if possible

 

Living room

remove ceiling tile and wet and or molded insulation. readjust strapping for sheetrock.

would like to see new trim (smaller)  in this room?

Orient (20).JPG (146016 bytes) Cassidy trying to help Dad

 Orient (19).JPG (135657 bytes)  Orient (18).JPG (125067 bytes)  Orient (21).JPG (117698 bytes) 

  Orient (26).JPG (153630 bytes)  readjust floor support were possible  Orient (26).JPG (153630 bytes)

 

 

Bathroom

  Orient (22).JPG (132012 bytes)   Move wall out 3 foot.  install new Toilet, Pedestal and claw tub, new light fixture

install 4" T&G floor to mach Kitchen, possible pine walls?

Orient (23).JPG (145449 bytes)   

 

 

Basement

 Orient (27).JPG (144104 bytes) remove this entryway from kitchen. 

  Orient (29).JPG (190833 bytes) 

  Orient (30).JPG (160081 bytes)  everything sitting in water.....maybe install cement blocks under beam suport?, not that exspence as long as we are readjusting floors by jacking it up anyway

Orient (32).JPG (196697 bytes)  Orient (33).JPG (166460 bytes)  Orient (34).JPG (149096 bytes)  Orient (35).JPG (174660 bytes)  Orient (36).JPG (168227 bytes) 

work on furnace (warm air unit), and electrical 

I'm  looking at minimal 8 days labor for entire project, that's with very little extra leeway.

 Thanks

 Tom Ammerman

207-827-3212

P.S we to need temporary fix roof  and many other little things that will come up

i.e. new basement door, new outlets, light fixtures, broken windows etc.

was unable to see roof because it was full of snow........